Algerian Studied Cases

« Previous case

ID: A2 Title: “Sidi Bel-Hassan” Mosque, Tlemcen, Algeria.  
Period of construction: 1296
Structural type: Cob structure
Chronology of intervention:
-1943: Reconstruction of the wood’s roof;
-2003: Structure restoration project.
Description of the Interventions:
-1943:
-Reconstruction of the wood’s roof after having been burnt.
-1956:
-Modification of the opening of the windows and carries to be exploited like museum.
-1957:
-The mosque is classified in the national historical heritage.
-1976:
-Appearance of cracks and degradations in the mihrab, some walls, coatings and roof.
January 2003:
-Analyses of the physical and mechanical states of the mosque.
June 2003:
-Implementation of a total restoration project that treats all of the mosque elements.

-Photos:
Mosque and some of restoration types.


© Copyright 2005/2024 DIPMEC